Triple
T3479221
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Samsung Engineering |
E73449
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineering, procurement, and construction company |
C426
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineering, procurement, and construction company Context triple: [Samsung Engineering, instanceOf, engineering, procurement, and construction company]
-
A.
construction management firm
A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
-
B.
engineering firm
chosen
An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
-
C.
infrastructure management company
An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
-
D.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
-
E.
multinational utility company
A multinational utility company is a large-scale enterprise that provides essential services such as electricity, gas, water, or telecommunications across multiple countries, operating under diverse regulatory, cultural, and market conditions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85b3c9b08190857cae74c7f36da9 |
completed | March 8, 2026, 2:20 p.m. |
Created at: March 8, 2026, 3:17 p.m.