Triple

T3470261
Position Surface form Disambiguated ID Type / Status
Subject MBTA Commuter Rail Greenbush Line E73239 entity
Predicate startPoint P389 FINISHED
Object South Station E18279 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Station | Statement: [MBTA Commuter Rail Greenbush Line, startPoint, South Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Station
Context triple: [MBTA Commuter Rail Greenbush Line, startPoint, South Station]
  • A. South Station chosen
    South Station is Boston’s major intercity rail and bus terminal and a key MBTA subway hub in the city’s downtown.
  • B. North Station
    North Station is a major transportation hub in Boston, Massachusetts, serving as a key commuter rail, subway, and intercity bus terminal integrated with the TD Garden arena.
  • C. MBTA North Station
    MBTA North Station is a major Boston transportation hub that serves as a key terminal for MBTA subway and commuter rail lines as well as Amtrak services.
  • D. Medford station
    Medford station is a Long Island Rail Road commuter rail stop located in Medford, New York, serving passengers on the Ronkonkoma Branch.
  • E. Lowell station
    Lowell station is a passenger rail station in Lowell, Massachusetts that serves as the northern terminus of the MBTA Commuter Rail’s Lowell Line.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85b2fed48190948c8765e453d270 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adbb392f6481908b6ad0457b8cf421 completed March 8, 2026, 6:08 p.m.
NED1 Entity disambiguation (via context triple) batch_69b503d9643881909737836640c22802 completed March 14, 2026, 6:44 a.m.
Created at: March 8, 2026, 3:17 p.m.