Triple

T34694392
Position Surface form Disambiguated ID Type / Status
Subject Richmond and North Woolwich E890986 entity
Predicate instanceOf P0 FINISHED
Object cross-London stopping service C51173 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-London stopping service
Context triple: [Richmond and North Woolwich, instanceOf, cross-London stopping service]
  • A. London Underground service pattern
    A London Underground service pattern is the structured arrangement of train routes, frequencies, stopping points, and operating times across the network that determines how services run on each line and branch.
  • B. cross-London rail system chosen
    A cross-London rail system is an integrated network of rail lines and tunnels that traverse the city from one side to the other, providing high-capacity, rapid transit across central London and connecting outer suburbs.
  • C. limited-stop bus service
    A limited-stop bus service is a transit route that only stops at selected key locations rather than every stop, reducing travel time for longer-distance passengers.
  • D. London Tramlink route
    A London Tramlink route is a designated service path within the Tramlink light rail network in South London, defined by its specific sequence of stops, operating pattern, and timetable.
  • E. London Underground line segment
    A London Underground line segment is a continuous stretch of track connecting two adjacent stations on a specific Tube line, along which trains travel directly without intermediate stops.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349db7ab8819086808e833f472871 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:05 a.m.