Triple

T34670731
Position Surface form Disambiguated ID Type / Status
Subject Moscow Railway administration building E890371 entity
Predicate instanceOf P0 FINISHED
Object railway administration building C35926 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway administration building
Context triple: [Moscow Railway administration building, instanceOf, railway administration building]
  • A. railway office building chosen
    A railway office building is a facility that houses the administrative, operational, and support functions necessary for managing railway services, infrastructure, and personnel.
  • B. railroad depot
    A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
  • C. former railway facility
    A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
  • D. former railway station
    A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
  • E. railway bridge terminus
    A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349d9c59481908b36baa0be093aea completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:05 a.m.