Triple
T3465141
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Stone Archway |
E73118
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | monumental arch |
C2172
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: monumental arch Context triple: [Stone Archway, instanceOf, monumental arch]
-
A.
triumphal arch
chosen
A triumphal arch is a monumental, freestanding structure with one or more arched passageways, built to commemorate significant victories, events, or individuals.
-
B.
stone arch bridge
A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
-
C.
monumental complex
A monumental complex is a large-scale, architecturally unified grouping of significant structures and spaces—such as temples, palaces, plazas, or memorials—designed to serve major ceremonial, political, religious, or commemorative functions.
-
D.
stone monument
A stone monument is a durable, often large-scale structure carved or assembled from stone to commemorate people, events, beliefs, or cultural values.
-
E.
granite bridge
A granite bridge is a durable, load-bearing structure constructed primarily from granite blocks or slabs, designed to span physical obstacles such as rivers, roads, or valleys.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85b224d481908ff8be51338d24ff |
completed | March 8, 2026, 2:20 p.m. |
Created at: March 8, 2026, 3:17 p.m.