Triple

T346469
Position Surface form Disambiguated ID Type / Status
Subject National Hurricane Center E6953 entity
Predicate instanceOf P0 FINISHED
Object tropical cyclone warning center C656 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tropical cyclone warning center
Context triple: [National Hurricane Center, instanceOf, tropical cyclone warning center]
  • A. meteorological organization chosen
    A meteorological organization is an entity responsible for observing, analyzing, and forecasting atmospheric conditions to support weather prediction, climate monitoring, and related public and scientific services.
  • B. disaster
    A disaster is a sudden, disruptive event—natural or human-made—that causes significant harm to people, property, or the environment and overwhelms normal coping capacities.
  • C. ocean current
    An ocean current is a continuous, directed movement of seawater driven by factors such as wind, Earth's rotation, temperature, and salinity differences, which redistributes heat, nutrients, and organisms across the world's oceans.
  • D. coastal region
    A coastal region is a geographic area where land meets the ocean or sea, characterized by unique environmental, economic, and cultural features shaped by its proximity to the shoreline.
  • E. headquarters
    The headquarters is the primary location where an organization’s central management, strategic decision-making, and key administrative functions are coordinated and controlled.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7951ba08190960e90823b5078f3 completed Feb. 28, 2026, 1:03 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.