Triple

T34591179
Position Surface form Disambiguated ID Type / Status
Subject Sikorsky S-58 design E888185 entity
Predicate instanceOf P0 FINISHED
Object rotorcraft design C59258 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rotorcraft design
Context triple: [Sikorsky S-58 design, instanceOf, rotorcraft design]
  • A. rotorcraft development program
    A rotorcraft development program is an organized, multi-phase effort to design, test, certify, and field new or improved rotary-wing aircraft to meet specified performance, safety, and mission requirements.
  • B. tiltrotor aircraft
    A tiltrotor aircraft is a type of aircraft with rotating engine nacelles or rotors that can tilt between vertical and horizontal positions, enabling both vertical takeoff and landing like a helicopter and efficient forward flight like an airplane.
  • C. rotary-wing UAV
    A rotary-wing UAV is an unmanned aerial vehicle that generates lift and maneuverability using one or more powered rotating wings or rotors, enabling vertical takeoff, landing, and hovering.
  • D. helicopter tail rotor system
    A helicopter tail rotor system is a mechanical assembly that provides anti-torque and directional control by generating lateral thrust at the tail of the helicopter.
  • E. tandem-rotor helicopter
    A tandem-rotor helicopter is a rotary-wing aircraft featuring two large horizontal rotors mounted one in front of the other, rotating in opposite directions to provide lift and directional control without the need for a tail rotor.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349d3bfcc81909874c99e646fb3ea completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:03 a.m.