Triple

T34581066
Position Surface form Disambiguated ID Type / Status
Subject Moscow Central Diameters E887902 entity
Predicate instanceOf P0 FINISHED
Object cross-city rail network C3549 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-city rail network
Context triple: [Moscow Central Diameters, instanceOf, cross-city rail network]
  • A. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • B. railway network chosen
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • C. cross-London rail system
    A cross-London rail system is an integrated network of rail lines and tunnels that traverse the city from one side to the other, providing high-capacity, rapid transit across central London and connecting outer suburbs.
  • D. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • E. commuter rail infrastructure
    Commuter rail infrastructure comprises the physical and operational systems—such as tracks, stations, signaling, power, and maintenance facilities—designed to support frequent, reliable passenger train service between suburbs and urban centers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349d25cbc8190869998de5915886b completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:03 a.m.