Triple

T34548503
Position Surface form Disambiguated ID Type / Status
Subject London Waterloo to Weymouth E886998 entity
Predicate instanceOf P0 FINISHED
Object South Western Main Line service C20256 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: South Western Main Line service
Context triple: [London Waterloo to Weymouth, instanceOf, South Western Main Line service]
  • A. Yarra Trams service
    A Yarra Trams service is an individual scheduled tram journey operated on Melbourne’s tram network, defined by its route, timetable, and vehicle providing passenger transport between designated stops.
  • B. London Underground service pattern
    A London Underground service pattern is the structured arrangement of train routes, frequencies, stopping points, and operating times across the network that determines how services run on each line and branch.
  • C. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • D. Sheffield Supertram route
    A Sheffield Supertram route is a defined public transport service path within the Sheffield light rail network, specifying the sequence of stops, track segments, and operational patterns followed by trams between termini.
  • E. railway line service pattern chosen
    A railway line service pattern defines the structured arrangement of train services over a route, including stopping sequences, frequencies, and service types that determine how trains operate along the line.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349cff89081908f91e0b064f4833e completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:02 a.m.