Triple

T34541606
Position Surface form Disambiguated ID Type / Status
Subject OsmoTRX E886820 entity
Predicate instanceOf P0 FINISHED
Object Osmocom project component C29206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Osmocom project component
Context triple: [OsmoTRX, instanceOf, Osmocom project component]
  • A. telecommunications software project chosen
    A telecommunications software project is an organized effort to design, develop, integrate, and deploy software systems that enable, manage, or optimize electronic communication over networks such as telephone, mobile, and internet infrastructures.
  • B. 3GPP network node
    A 3GPP network node is a standardized functional entity within a 3GPP-defined mobile network (such as LTE or 5G) that performs specific control, user-plane, or management tasks to enable communication services.
  • C. OSS branch
    An OSS branch is a parallel line of development in an open-source software repository where changes can be made, tested, and reviewed independently before being merged into the main codebase.
  • D. network protocol component
    A network protocol component is a modular element within a communication system that implements specific protocol functions—such as message formatting, routing, error handling, or session management—to enable reliable data exchange between networked entities.
  • E. AmigaOS component
    An AmigaOS component is a modular software or hardware element that provides specific functionality within the Amiga operating system environment, such as device drivers, libraries, or system tools.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349ce5eb881909e431c670944aa68 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:02 a.m.