Triple

T34536364
Position Surface form Disambiguated ID Type / Status
Subject Casa Fuster (initial project, later modified) E886679 entity
Predicate instanceOf P0 FINISHED
Object Modernisme work C11086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Modernisme work
Context triple: [Casa Fuster (initial project, later modified), instanceOf, Modernisme work]
  • A. Modernisme architect
    A Modernisme architect is a designer who creates buildings characterized by Catalan Art Nouveau’s organic forms, rich ornamentation, and innovative use of materials and structure at the turn of the 20th century.
  • B. modernisme building chosen
    A modernisme building is an early 20th-century architectural structure characterized by organic forms, rich ornamentation, innovative use of materials, and a synthesis of arts and crafts, particularly associated with Catalan Modernism.
  • C. modernist work
    A modernist work is an artistic or literary creation that breaks with traditional forms and conventions to explore fragmented perspectives, subjective experience, and the uncertainties of modern life.
  • D. modernist architecture work
    A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
  • E. work of Antoni Gaudí
    The work of Antoni Gaudí is a distinctive architectural style characterized by organic forms, vibrant colors, intricate ornamentation, and innovative structural solutions that blend nature, symbolism, and Catalan Modernism.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349ce5eb881909e431c670944aa68 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:02 a.m.