Triple
T3434382
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sheikh Jaber Al-Ahmad Al-Sabah Causeway |
E72413
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sea bridge |
C4842
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sea bridge Context triple: [Sheikh Jaber Al-Ahmad Al-Sabah Causeway, instanceOf, sea bridge]
-
A.
cross-sea bridge
chosen
A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
-
B.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
C.
canal bridge
A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
-
D.
movable bridge
A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
-
E.
toll bridge
A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85af50288190a854b76653deee6f |
completed | March 8, 2026, 2:20 p.m. |
Created at: March 8, 2026, 3:16 p.m.