Triple

T34288016
Position Surface form Disambiguated ID Type / Status
Subject 251st Cyberspace Engineering Installation Group E879795 entity
Predicate instanceOf P0 FINISHED
Object cyberspace engineering installation group C51545 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cyberspace engineering installation group
Context triple: [251st Cyberspace Engineering Installation Group, instanceOf, cyberspace engineering installation group]
  • A. cyberspace operations component
    A cyberspace operations component is an organizational element responsible for planning, directing, and executing military or security activities within and through cyberspace to achieve assigned objectives.
  • B. cyberspace operations command
    A cyberspace operations command is a military or governmental organizational entity responsible for planning, directing, and executing offensive, defensive, and support activities within and through cyberspace to achieve strategic and operational objectives.
  • C. engineering group chosen
    An engineering group is a coordinated team of engineers and related specialists who collaboratively design, develop, and maintain technical systems or products to meet specific organizational goals.
  • D. Engineer brigade
    An engineer brigade is a military unit composed of specialized engineering battalions that provide construction, mobility, counter-mobility, and survivability support to larger combat formations.
  • E. private military contractor team
    A private military contractor team is a coordinated group of hired security and combat specialists who provide military-style services—such as protection, training, and tactical operations—for governments, corporations, or other clients under contractual agreements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349b6df1c81908e5e5b6c2ab6409b completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 1:57 a.m.