Triple

T34233585
Position Surface form Disambiguated ID Type / Status
Subject 2017 International Champions Cup E878271 entity
Predicate instanceOf P0 FINISHED
Object pre-season competition C7835 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pre-season competition
Context triple: [2017 International Champions Cup, instanceOf, pre-season competition]
  • A. preseason exhibition games chosen
    Preseason exhibition games are non-competitive, preparatory matches played before the official season begins to evaluate players, test strategies, and build team readiness without affecting regular-season standings.
  • B. club competition
    A club competition is an organized event in which teams or individuals representing clubs compete against each other under defined rules to determine rankings, titles, or awards.
  • C. sports competition phase
    A sports competition phase is a distinct, time-bounded segment of a sporting event or tournament (such as group stage, knockout round, or finals) characterized by specific rules, objectives, and progression criteria for participants.
  • D. postseason tournament
    A postseason tournament is a structured competition held after a regular season in which qualifying teams or individuals compete in a series of elimination or advancement rounds to determine a champion.
  • E. postseason sporting event
    A postseason sporting event is a competitive game or series held after a regular season to determine champions, rankings, or advancement in a sport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349b22d8c819096b22df268382aa9 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 1:56 a.m.