Triple
T3418227
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gradle |
E72061
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | software build system |
C9685
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: software build system Context triple: [Gradle, instanceOf, software build system]
-
A.
software build and distribution system
chosen
A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
-
B.
library building program
A library building program is an organized initiative that plans, funds, designs, and constructs or renovates library facilities to meet community information, learning, and cultural needs.
-
C.
builder
A builder is an entity responsible for constructing or assembling complex objects or structures step-by-step, often following a specified plan or design.
-
D.
compiler system
A compiler system is a software toolchain that translates high-level source code into lower-level machine or intermediate code, performing analysis, optimization, and code generation to produce an executable program.
-
E.
building complex
A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85ad38e48190b7660c5118a35289 |
completed | March 8, 2026, 2:20 p.m. |
Created at: March 8, 2026, 3:15 p.m.