Triple
T34144130
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Farman F.40 |
E875802
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pusher configuration aircraft |
C37056
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pusher configuration aircraft Context triple: [Farman F.40, instanceOf, pusher configuration aircraft]
-
A.
pusher aircraft
chosen
A pusher aircraft is an airplane in which the engine-mounted propeller is located behind the main structure, pushing the aircraft forward rather than pulling it.
-
B.
airship commander
An airship commander is the strategic leader responsible for navigating, operating, and directing an airship and its crew during both routine voyages and critical missions.
-
C.
aircraft type
An aircraft type is a classification of aircraft sharing the same basic design, performance characteristics, and operational capabilities, typically defined by a manufacturer and certified as a distinct model.
-
D.
cargo airport
A cargo airport is a specialized aviation facility designed primarily for the handling, storage, and transportation of freight and mail, featuring extensive logistics infrastructure and limited or no passenger services.
-
E.
piggyback seaplane system
A piggyback seaplane system is an aircraft configuration in which a smaller, water-capable plane is mounted atop a larger carrier aircraft for transport, launch, or recovery operations over water.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349aaeef08190a20e72a3fdeb7052 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 1:54 a.m.