Triple

T34096820
Position Surface form Disambiguated ID Type / Status
Subject Georgia Power hydroelectric dam at Lake Sinclair E874451 entity
Predicate instanceOf P0 FINISHED
Object power-generating structure C14265 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: power-generating structure
Context triple: [Georgia Power hydroelectric dam at Lake Sinclair, instanceOf, power-generating structure]
  • A. electric power station chosen
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • B. wind power facility
    A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
  • C. planned hydroelectric power station
    A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
  • D. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • E. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349a735208190a1dbfb1c2a121059 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 1:53 a.m.