Triple

T34012905
Position Surface form Disambiguated ID Type / Status
Subject Walk London network E872161 entity
Predicate instanceOf P0 FINISHED
Object recreational walking infrastructure C2914 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: recreational walking infrastructure
Context triple: [Walk London network, instanceOf, recreational walking infrastructure]
  • A. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • B. recreation trail chosen
    A recreation trail is a designated path or route intended for non-motorized leisure activities such as walking, hiking, cycling, or horseback riding, often located in natural or scenic areas.
  • C. bicycle and pedestrian network
    A bicycle and pedestrian network is an interconnected system of paths, lanes, sidewalks, and crossings designed to safely and efficiently accommodate non-motorized travel for cyclists and walkers.
  • D. pedestrian network
    A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
  • E. paved multi-use path
    A paved multi-use path is a smooth, hard-surfaced corridor designed to safely accommodate a variety of non-motorized users such as pedestrians, cyclists, and skaters.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349a08848819084b348d64c1879c3 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:51 a.m.