Triple
T33997650
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barcelona Metro 2100 series |
E871718
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Barcelona Metro rolling stock |
C60218
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Barcelona Metro rolling stock Context triple: [Barcelona Metro 2100 series, instanceOf, Barcelona Metro rolling stock]
-
A.
Barcelona Metro station
A Barcelona Metro station is an underground or surface-level facility within the Barcelona rapid transit network where passengers access, board, and transfer between metro trains via platforms, ticketing areas, and related services.
-
B.
Medellín Metro line
A Medellín Metro line is a fixed public transit route within the Medellín Metro system, consisting of a sequence of stations and track segments that provide rapid, high-capacity rail service across specific urban and metropolitan corridors.
-
C.
Metromover line
A Metromover line is a designated route within an automated, elevated people-mover system that connects multiple stations along a fixed path in an urban area.
-
D.
Cercanías network
A Cercanías network is a suburban and regional commuter rail system that connects a metropolitan city center with its surrounding towns and suburbs through frequent, short- to medium-distance train services.
-
E.
monorail rolling stock
Monorail rolling stock comprises the specialized rail vehicles designed to operate on a single-rail guideway, including powered trains and unpowered cars used for passenger or freight transport.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3499f8cbc81908de6ec89fa91ea8f |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:50 a.m.