Triple

T3396771
Position Surface form Disambiguated ID Type / Status
Subject Halloween Carnaval E71547 entity
Predicate instanceOf P0 FINISHED
Object Halloween celebration C3266 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Halloween celebration
Context triple: [Halloween Carnaval, instanceOf, Halloween celebration]
  • A. New Year celebration
    A New Year celebration is a festive event marking the transition from one year to the next, typically involving gatherings, countdowns, fireworks, and cultural or personal rituals of reflection and renewal.
  • B. harvest festival
    A harvest festival is a communal celebration held at the end of the growing season to give thanks for and enjoy the gathered crops through feasting, rituals, and cultural traditions.
  • C. holiday standard
    A holiday standard is a widely recognized and repeatedly celebrated song, film, or tradition that recurs each holiday season and is culturally regarded as timeless.
  • D. annual holiday festival chosen
    An annual holiday festival is a recurring, community-centered celebration held once a year to commemorate a specific cultural, religious, or seasonal occasion through shared traditions, events, and activities.
  • E. holiday weekend
    A holiday weekend is an extended weekend that includes at least one public or religious holiday, often giving people extra time off for travel, leisure, or special events.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a9c4a88190a854019341cb3b60 completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:14 p.m.