Triple
T3394536
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | West Entrance Station |
E71497
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | park entrance station |
C6652
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: park entrance station Context triple: [West Entrance Station, instanceOf, park entrance station]
-
A.
theme park entrance
The theme park entrance is the primary access point where guests transition from the outside world into the park, typically featuring ticketing, security, and iconic visual elements that establish the park’s identity and atmosphere.
-
B.
park system
A park system is an organized network of public parks and green spaces managed collectively to provide recreation, conservation, and aesthetic benefits to a community or region.
-
C.
entrance
chosen
An entrance is a designated point of access that allows people or objects to move from the outside into a defined space or area.
-
D.
park feature
A park feature is any designed or natural element within a park—such as paths, benches, playgrounds, gardens, or water bodies—that contributes to its use, aesthetics, or ecological value.
-
E.
park-and-ride facility
A park-and-ride facility is a designated parking area where commuters leave their vehicles and transfer to public transportation for the remainder of their journey.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85a9c4a88190a854019341cb3b60 |
completed | March 8, 2026, 2:20 p.m. |
Created at: March 8, 2026, 3:14 p.m.