Triple
T33899694
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SS Empress of Britain (2027) |
E869012
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned ocean liner |
C2684
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned ocean liner Context triple: [SS Empress of Britain (2027), instanceOf, planned ocean liner]
-
A.
ocean liner
chosen
An ocean liner is a large, robust passenger ship designed for regular long-distance sea voyages, typically across oceans, with an emphasis on speed, safety, and comfort rather than leisure amenities alone.
-
B.
Spirit-class ferry
The Spirit-class ferry is a large, double-ended passenger and vehicle vessel designed for high-capacity, short- to medium-distance coastal and inter-island routes.
-
C.
Liberty ship
A Liberty ship is a type of mass-produced World War II cargo vessel built by the United States to quickly transport war materials and goods across the oceans.
-
D.
passenger and mail steamer
A passenger and mail steamer is a steam-powered vessel designed to transport people and postal cargo on scheduled routes across seas, rivers, or coastal waters.
-
E.
planned ship class
A planned ship class is a conceptual category of vessels that are formally designed and proposed, but not yet constructed or commissioned.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34997703c8190866b1d404bce531f |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:48 a.m.