Triple

T33864486
Position Surface form Disambiguated ID Type / Status
Subject Debian Social Contract E868009 entity
Predicate instanceOf P0 FINISHED
Object foundational project document C531 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: foundational project document
Context triple: [Debian Social Contract, instanceOf, foundational project document]
  • A. foundational document collection
    A foundational document collection is an organized set of core, authoritative records that establish the essential principles, requirements, and context for a system, organization, or project.
  • B. design document
    A design document is a detailed written plan that outlines the architecture, components, behavior, and rationale of a system or feature before implementation.
  • C. founding document chosen
    A founding document is an authoritative text that formally establishes an organization, institution, or state by defining its core principles, structure, and governing rules.
  • D. public works project
    A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
  • E. government-sponsored documentation project
    A government-sponsored documentation project is an officially funded and managed initiative to systematically collect, record, and preserve information, data, or cultural materials for public, administrative, or historical purposes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34995029081909ede0f7df73d1a5e completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:47 a.m.