Triple

T3386332
Position Surface form Disambiguated ID Type / Status
Subject Murrurundi E71310 entity
Predicate transportLink P11026 FINISHED
Object New England Highway E71057 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New England Highway | Statement: [Murrurundi, transportLink, New England Highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New England Highway
Context triple: [Murrurundi, transportLink, New England Highway]
  • A. New England Highway chosen
    The New England Highway is a major inland highway in eastern Australia that links New South Wales and Queensland, serving as a key transport route through the New England region.
  • B. Mitchell Highway
    The Mitchell Highway is a major rural highway in New South Wales and Queensland, Australia, linking inland regional centres and serving as a key transport route across the central west of the country.
  • C. Bass Highway
    Bass Highway is a major arterial road in Tasmania, Australia, linking key coastal towns and cities including Burnie.
  • D. Glenn Highway
    Glenn Highway is a primary roadway in Alaska that connects the city of Anchorage with interior regions of the state, serving as a key transportation corridor.
  • E. Shirley Highway
    Shirley Highway is a major freeway in Northern Virginia that forms part of the primary commuter route between the suburbs and Washington, D.C.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a8fd9c819095ecedf838d2bf1b completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb662d190819085b211dac85a83b2 completed March 8, 2026, 5:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5f580e2488190bce70398502e11d4 completed March 14, 2026, 11:55 p.m.
Created at: March 8, 2026, 3:14 p.m.