Triple

T338332
Position Surface form Disambiguated ID Type / Status
Subject Washington River Protection Solutions E6777 entity
Predicate instanceOf P0 FINISHED
Object environmental remediation company C423 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: environmental remediation company
Context triple: [Washington River Protection Solutions, instanceOf, environmental remediation company]
  • A. Superfund site
    A Superfund site is a contaminated location in the United States designated by the Environmental Protection Agency for long-term cleanup of hazardous substances and pollutants under the Superfund program.
  • B. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • C. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • D. computer services company
    A computer services company is an organization that provides technical expertise, support, and solutions related to computer systems, software, networks, and IT infrastructure for individuals or other businesses.
  • E. company chosen
    A company is an organized entity, legally recognized or informally structured, that coordinates people and resources to produce goods or services for customers, typically in pursuit of profit or specific objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e79434908190a9d5afe415153ad9 completed Feb. 28, 2026, 1:03 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.