Triple
T338332
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Washington River Protection Solutions |
E6777
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | environmental remediation company |
C423
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: environmental remediation company Context triple: [Washington River Protection Solutions, instanceOf, environmental remediation company]
-
A.
Superfund site
A Superfund site is a contaminated location in the United States designated by the Environmental Protection Agency for long-term cleanup of hazardous substances and pollutants under the Superfund program.
-
B.
engineering firm
An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
-
C.
manufacturing company
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
D.
computer services company
A computer services company is an organization that provides technical expertise, support, and solutions related to computer systems, software, networks, and IT infrastructure for individuals or other businesses.
-
E.
company
chosen
A company is an organized entity, legally recognized or informally structured, that coordinates people and resources to produce goods or services for customers, typically in pursuit of profit or specific objectives.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e79434908190a9d5afe415153ad9 |
completed | Feb. 28, 2026, 1:03 p.m. |
Created at: Feb. 28, 2026, 1:08 p.m.