Triple

T338236
Position Surface form Disambiguated ID Type / Status
Subject F Reactor E6774 entity
Predicate nearbyFacility P350 FINISHED
Object D Reactor E6773 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: D Reactor | Statement: [F Reactor, nearbyFacility, D Reactor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: D Reactor
Context triple: [F Reactor, nearbyFacility, D Reactor]
  • A. D Reactor chosen
    D Reactor was one of the early plutonium production reactors at the Hanford Site in Washington, built during the Manhattan Project to support the U.S. nuclear weapons program.
  • B. K-West Reactor
    K-West Reactor is one of the plutonium production reactors at the Hanford Site in Washington State, historically used to support the U.S. nuclear weapons program.
  • C. K-East Reactor
    K-East Reactor was one of the plutonium production reactors at the Hanford Site in Washington State, built during the Cold War to support the U.S. nuclear weapons program.
  • D. H Reactor
    H Reactor was one of the plutonium-producing nuclear reactors at the Hanford Site in Washington, built during the Cold War as part of the U.S. nuclear weapons program.
  • E. N Reactor
    N Reactor was a dual-purpose plutonium production and power-generating nuclear reactor at the Hanford Site in Washington, notable for its graphite-moderated, water-cooled design and role in the U.S. Cold War weapons program.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e79434908190a9d5afe415153ad9 completed Feb. 28, 2026, 1:03 p.m.
NER Named-entity recognition batch_69a2eae23b0c819081f8bf9ac26685ab completed Feb. 28, 2026, 1:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69a3e572e9c48190b177b363ed8a8404 completed March 1, 2026, 7:06 a.m.
Created at: Feb. 28, 2026, 1:08 p.m.