Triple

T33780599
Position Surface form Disambiguated ID Type / Status
Subject River Huntspill E865644 entity
Predicate instanceOf P0 FINISHED
Object artificial drainage channel C6500 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: artificial drainage channel
Context triple: [River Huntspill, instanceOf, artificial drainage channel]
  • A. drainage channel chosen
    A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
  • B. engineered waterway
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • C. artificial embankment
    An artificial embankment is a man-made raised structure of earth, rock, or other materials built to contain, redirect, or protect land and infrastructure from water or other environmental forces.
  • D. canal aqueduct
    A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
  • E. constricted water channel
    A constricted water channel is a narrow, often engineered or naturally formed passage that restricts and directs the flow of water, increasing velocity and influencing local hydrodynamics.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3498ecc2c8190bcd85e3f11dc215e completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:45 a.m.