Triple
T33780599
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | River Huntspill |
E865644
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | artificial drainage channel |
C6500
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: artificial drainage channel Context triple: [River Huntspill, instanceOf, artificial drainage channel]
-
A.
drainage channel
chosen
A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
-
B.
engineered waterway
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
C.
artificial embankment
An artificial embankment is a man-made raised structure of earth, rock, or other materials built to contain, redirect, or protect land and infrastructure from water or other environmental forces.
-
D.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
E.
constricted water channel
A constricted water channel is a narrow, often engineered or naturally formed passage that restricts and directs the flow of water, increasing velocity and influencing local hydrodynamics.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3498ecc2c8190bcd85e3f11dc215e |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:45 a.m.