Triple
T33777161
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cofiroute USA |
E865553
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transportation infrastructure company |
C6258
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transportation infrastructure company Context triple: [Cofiroute USA, instanceOf, transportation infrastructure company]
-
A.
transportation network company
A transportation network company is a business that uses digital platforms, typically mobile apps, to connect passengers with drivers who provide on-demand transportation services.
-
B.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
-
C.
transportation services company
A transportation services company is an organization that plans, manages, and operates the movement of people or goods using various modes of transport, such as road, rail, air, or sea, often providing logistics, scheduling, and support services.
-
D.
road construction company
A road construction company is an organization that plans, designs, builds, repairs, and maintains roads and related infrastructure for public and private clients.
-
E.
toll road operator
chosen
A toll road operator is an entity responsible for managing, maintaining, and collecting user fees on designated roadways or bridges, often under government concession or private ownership.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3498df6f88190bf9647ea4e4a956e |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:45 a.m.