Triple
T33725980
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Central Institute of Educational Technology |
E864144
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | constituent unit of NCERT |
C61586
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: constituent unit of NCERT Context triple: [Central Institute of Educational Technology, instanceOf, constituent unit of NCERT]
-
A.
Arm of the Union Government of India
An Arm of the Union Government of India is an institutional entity or body that operates under the authority of the central government to implement its policies, exercise its powers, or deliver public services at the national level.
-
B.
BHEL unit
A BHEL unit is an industrial facility or division of Bharat Heavy Electricals Limited dedicated to the design, manufacture, testing, and servicing of heavy electrical equipment and power plant components.
-
C.
constituent country
A constituent country is a semi-autonomous nation within a larger sovereign state, possessing its own government and identity while sharing overarching sovereignty and institutions with the parent state.
-
D.
subunit
chosen
A subunit is an individual, distinguishable component that combines with other such components to form a larger, functional whole.
-
E.
educational unit
An educational unit is a structured segment of instruction focused on a specific topic or set of learning objectives within a broader course or curriculum.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3498a64cc8190b4b414c67b280d93 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:44 a.m.