Triple
T33724879
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 105NaDK |
E864115
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | modernized tram |
C9233
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: modernized tram Context triple: [105NaDK, instanceOf, modernized tram]
-
A.
high-floor tram
A high-floor tram is a rail vehicle for urban passenger transport with a raised floor level that typically requires steps or elevated platforms for boarding.
-
B.
rapid transit vehicle
A rapid transit vehicle is a high-capacity, electrically powered rail car or train designed to provide frequent, fast, and reliable urban or suburban passenger transportation on dedicated or grade-separated tracks.
-
C.
tramcar type
chosen
A tramcar type is a classification of tram vehicles based on shared design, capacity, and operational characteristics used in urban rail transit systems.
-
D.
light rail vehicle
A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
-
E.
elevated railway
An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3498a64cc8190b4b414c67b280d93 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:44 a.m.