Triple
T33722445
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Smith chart |
E864053
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineering diagram |
C39070
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineering diagram Context triple: [Smith chart, instanceOf, engineering diagram]
-
A.
logical diagram
chosen
A logical diagram is a visual representation that illustrates the relationships, structure, and flow of logic among concepts, conditions, or propositions within a system or argument.
-
B.
link diagram
A link diagram is a planar projection of one or more intertwined loops (links) in three-dimensional space, with crossing information indicated to represent their topological structure.
-
C.
diagram feature
A diagram feature is a distinct visual or structural element within a diagram (such as shapes, connectors, labels, or annotations) that conveys specific information or supports the diagram’s overall meaning and functionality.
-
D.
engineering work
Engineering work is the systematic application of scientific, mathematical, and technical principles to design, develop, analyze, and maintain structures, systems, devices, or processes that solve practical problems.
-
E.
ketch
A ketch is a sailing vessel with two masts, where the shorter mizzen mast is located forward of the rudder post and is typically rigged with a mainsail and one or more headsails.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34989871c81908682e22a2fe4b829 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:44 a.m.