Triple
T3367539
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Itezhi-Tezhi Dam |
E70872
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water-regulation dam |
C5154
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water-regulation dam Context triple: [Itezhi-Tezhi Dam, instanceOf, water-regulation dam]
-
A.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
B.
irrigation dam
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
-
C.
water management project
A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
-
D.
water management structure
chosen
A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
-
E.
multipurpose dam
A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85a729d48190afd789cd8417f289 |
completed | March 8, 2026, 2:20 p.m. |
Created at: March 8, 2026, 3:13 p.m.