Triple
T33666063
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Geneva Mouettes |
E862495
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water shuttle network |
C15692
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water shuttle network Context triple: [Geneva Mouettes, instanceOf, water shuttle network]
-
A.
ferry service network
chosen
A ferry service network is a coordinated system of water-based transport routes, vessels, terminals, and schedules that moves passengers and cargo between multiple ports or coastal locations.
-
B.
waterbus line
A waterbus line is a scheduled public transport route operated by passenger boats or ferries along waterways, connecting designated stops much like a bus line on roads.
-
C.
waterway network
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
D.
waterway navigation system
A waterway navigation system is an integrated set of tools, sensors, and software that provides real-time guidance, routing, and safety information for vessels traveling on rivers, canals, and other inland or coastal waterways.
-
E.
navigable waterway
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34984c4008190bb82f33a7819da64 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:42 a.m.