Triple
T33655557
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Freestyle Love Supreme Broadway production |
E862209
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Broadway musical comedy show |
C1715
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Broadway musical comedy show Context triple: [Freestyle Love Supreme Broadway production, instanceOf, Broadway musical comedy show]
-
A.
Broadway musical
chosen
A Broadway musical is a large-scale theatrical production that combines spoken dialogue, songs, and dance, performed in professional theaters in New York City's Broadway district.
-
B.
comedy musical
A comedy musical is a theatrical or film production that combines humorous storytelling with songs, music, and often dance to entertain and amuse the audience.
-
C.
series of Broadway musical comedies
A series of Broadway musical comedies is a collection of stage productions presented on Broadway that combine humorous narratives, spoken dialogue, songs, and dance, often sharing thematic or stylistic elements across multiple shows.
-
D.
Broadway-style theatre
A Broadway-style theatre is a large, professional performance venue designed to host high-budget, commercial stage productions featuring elaborate sets, lighting, and live musical or dramatic performances.
-
E.
West End musical production
A West End musical production is a large-scale, professionally staged musical theatre show performed in one of London’s major commercial theatres, typically featuring high production values, extended runs, and broad public appeal.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349840ba881908e3bfce536aeb92b |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:42 a.m.