Triple

T3364494
Position Surface form Disambiguated ID Type / Status
Subject Estacada, Oregon E70801 entity
Predicate hasNearbyHydroelectricFacilities P15311 FINISHED
Object Portland General Electric dams on the Clackamas River LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Portland General Electric dams on the Clackamas River | Statement: [Estacada, Oregon, hasNearbyHydroelectricFacilities, Portland General Electric dams on the Clackamas River]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasNearbyHydroelectricFacilities
Context triple: [Estacada, Oregon, hasNearbyHydroelectricFacilities, Portland General Electric dams on the Clackamas River]
  • A. hasHydroelectricProject chosen
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • B. hydropowerPotential
    Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
  • C. hydroelectricStationCommissioned
    Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
  • D. hasNearbyWatersUsedBy
    Indicates that a body of water located near an entity is utilized or accessed by another specified entity.
  • E. hydroelectricStationCapacity
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a729d48190afd789cd8417f289 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb28467b88190bdf70b851bc8efa9 completed March 8, 2026, 5:31 p.m.
PD Predicate disambiguation batch_69ada4317e288190ab7d0f66e9dba65f completed March 8, 2026, 4:30 p.m.
Created at: March 8, 2026, 3:13 p.m.