Triple
T3364494
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Estacada, Oregon |
E70801
|
entity |
| Predicate | hasNearbyHydroelectricFacilities |
P15311
|
FINISHED |
| Object | Portland General Electric dams on the Clackamas River |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Portland General Electric dams on the Clackamas River | Statement: [Estacada, Oregon, hasNearbyHydroelectricFacilities, Portland General Electric dams on the Clackamas River]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasNearbyHydroelectricFacilities Context triple: [Estacada, Oregon, hasNearbyHydroelectricFacilities, Portland General Electric dams on the Clackamas River]
-
A.
hasHydroelectricProject
chosen
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
-
B.
hydropowerPotential
Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
-
C.
hydroelectricStationCommissioned
Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
-
D.
hasNearbyWatersUsedBy
Indicates that a body of water located near an entity is utilized or accessed by another specified entity.
-
E.
hydroelectricStationCapacity
Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85a729d48190afd789cd8417f289 |
completed | March 8, 2026, 2:20 p.m. |
| NER | Named-entity recognition | batch_69adb28467b88190bdf70b851bc8efa9 |
completed | March 8, 2026, 5:31 p.m. |
| PD | Predicate disambiguation | batch_69ada4317e288190ab7d0f66e9dba65f |
completed | March 8, 2026, 4:30 p.m. |
Created at: March 8, 2026, 3:13 p.m.