Triple

T33605346
Position Surface form Disambiguated ID Type / Status
Subject Pulse 95th Street Line E860834 entity
Predicate instanceOf P0 FINISHED
Object planned transportation project C60625 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned transportation project
Context triple: [Pulse 95th Street Line, instanceOf, planned transportation project]
  • A. planned transit project
    A planned transit project is a proposed public transportation initiative, such as a new route, line, or facility, that is formally defined and scheduled but not yet constructed or in operation.
  • B. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • C. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • D. planned public transit line chosen
    A planned public transit line is a proposed, not-yet-built transportation route with defined stops, alignment, and service characteristics intended for future public operation.
  • E. commuter rail project
    A commuter rail project is a coordinated planning, design, and construction effort to develop or improve rail services that transport passengers between suburbs or outlying regions and a central urban area, typically focused on reducing congestion and improving regional mobility.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3498037c88190a4500f002b5540e0 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:41 a.m.