Triple

T3353398
Position Surface form Disambiguated ID Type / Status
Subject A59 road E70547 entity
Predicate hasJunctionWith P1018 FINISHED
Object A1(M) motorway E91895 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A1(M) motorway | Statement: [A59 road, hasJunctionWith, A1(M) motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A1(M) motorway
Context triple: [A59 road, hasJunctionWith, A1(M) motorway]
  • A. A1(M) motorway chosen
    The A1(M) motorway is a series of motorway-standard sections along the A1 route in England, providing a high-speed link between London and the North and connecting with major routes such as the M25.
  • B. A16 motorway
    The A16 motorway is a major French highway in northern France that connects the Paris region to the Channel coast and Belgium.
  • C. A10 motorway
    The A10 motorway is a major French autoroute that connects the Paris region to the southwest of France, including cities such as Orléans, Tours, and Bordeaux.
  • D. A10 motorway
    The A10 motorway is the ring road encircling Amsterdam, serving as a major traffic artery that connects various parts of the city with national and international routes.
  • E. A14 motorway
    The A14 motorway is a major Italian highway running along the Adriatic coast, connecting Bologna with Taranto and serving numerous coastal cities including Pescara.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a4ef7c8190a29e2bbd6fa454e4 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb23ec53881908a04c7f784fe8c43 completed March 8, 2026, 5:30 p.m.
NED1 Entity disambiguation (via context triple) batch_69beef70e6048190b0e5659a59634d5d completed March 21, 2026, 7:20 p.m.
Created at: March 8, 2026, 3:13 p.m.