Triple

T33504407
Position Surface form Disambiguated ID Type / Status
Subject U.S. Terminal Procedures Publications E858075 entity
Predicate instanceOf P0 FINISHED
Object instrument procedure chart C60524 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: instrument procedure chart
Context triple: [U.S. Terminal Procedures Publications, instanceOf, instrument procedure chart]
  • A. instrument flight procedure chosen
    An instrument flight procedure is a predefined series of maneuvers and routes, based on instrument navigation and published criteria, that guides an aircraft safely to or from an airport under instrument meteorological conditions.
  • B. aviation manual
    An aviation manual is a comprehensive reference document that provides pilots, crew, and maintenance personnel with standardized procedures, operational guidelines, safety protocols, and technical information necessary for the safe and efficient operation of aircraft.
  • C. aeronautical information publication
    An aeronautical information publication is an official, regularly issued document that provides essential, long-term aeronautical information necessary for the safety, regularity, and efficiency of air navigation within a specific state or region.
  • D. aeronautical information product
    An aeronautical information product is a compiled and formatted set of aviation-related data (such as charts, publications, and digital datasets) designed to support the safe and efficient planning, execution, and management of air navigation.
  • E. ICAO standard
    An ICAO standard is an internationally agreed set of rules, specifications, and recommended practices established by the International Civil Aviation Organization to ensure the safety, regularity, and efficiency of global civil aviation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3497660508190a541826a81f7e9ab completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:38 a.m.