Triple
T3349776
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Skyway Monte Bianco |
E70461
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | aerial lift |
C12623
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: aerial lift Context triple: [Skyway Monte Bianco, instanceOf, aerial lift]
-
A.
airlift
Airlift is a logistical operation that transports people, equipment, or supplies by aircraft, typically over long distances or into areas difficult to reach by land or sea.
-
B.
heavy-lift helicopter
A heavy-lift helicopter is a large rotary-wing aircraft designed to transport exceptionally heavy cargo, equipment, or personnel, often in challenging environments and over relatively short distances.
-
C.
utility helicopter
A utility helicopter is a versatile rotary-wing aircraft designed to perform a wide range of support roles such as transport, reconnaissance, search and rescue, and logistical missions.
-
D.
elevator
An elevator is a vertically moving transport device within a building that carries people or goods between different floors using a guided platform and mechanical lifting system.
-
E.
vertical-lift bridge
A vertical-lift bridge is a movable bridge whose central span rises vertically between two towers to allow river or maritime traffic to pass beneath while maintaining a level roadway.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85a4ef7c8190a29e2bbd6fa454e4 |
completed | March 8, 2026, 2:20 p.m. |
Created at: March 8, 2026, 3:12 p.m.