Triple

T3347579
Position Surface form Disambiguated ID Type / Status
Subject Daintree River ferry crossing E70411 entity
Predicate instanceOf P0 FINISHED
Object vehicular ferry crossing C4628 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: vehicular ferry crossing
Context triple: [Daintree River ferry crossing, instanceOf, vehicular ferry crossing]
  • A. vehicle ferry chosen
    A vehicle ferry is a boat or ship designed to transport cars, trucks, and other vehicles, along with their passengers, across bodies of water.
  • B. ferry service
    A ferry service is a transportation operation that regularly carries passengers, vehicles, and sometimes cargo across bodies of water along fixed routes and schedules.
  • C. passenger ferry
    A passenger ferry is a vessel designed to transport people, and sometimes light vehicles or cargo, across bodies of water on regular, short-distance routes.
  • D. auto ferry train
    An auto ferry train is a specialized rail service designed to transport passengers along with their vehicles—such as cars, motorcycles, and small trucks—across long distances or through otherwise impassable routes like tunnels or mountainous regions.
  • E. ferry terminal
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a4ef7c8190a29e2bbd6fa454e4 completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:12 p.m.