Triple

T3345800
Position Surface form Disambiguated ID Type / Status
Subject Apple Macintosh team E70371 entity
Predicate instanceOf P0 FINISHED
Object product development team C8686 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: product development team
Context triple: [Apple Macintosh team, instanceOf, product development team]
  • A. software development team chosen
    A software development team is a collaborative group of professionals with complementary technical and organizational skills who work together to design, build, test, and maintain software products or systems.
  • B. design team
    A design team is a collaborative group of professionals who combine diverse creative, technical, and strategic skills to research, conceptualize, and produce user-centered design solutions.
  • C. product line
    A product line is a group of related products offered by a company that share similar characteristics, target markets, or functions, and are marketed under a common brand strategy.
  • D. robotics team
    A robotics team is a collaborative group of individuals who design, build, program, and test robots to solve specific challenges or compete in organized events.
  • E. computer product line
    A computer product line is a family of related computer models or configurations that share a common design and components but vary in features, performance, and price to target different customer needs and market segments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a405e48190b6e68de7cf9f319e completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:12 p.m.