Triple

T33447339
Position Surface form Disambiguated ID Type / Status
Subject Scarborough Subway Extension of Line 2 Bloor–Danforth E856542 entity
Predicate instanceOf P0 FINISHED
Object rapid transit project C35368 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rapid transit project
Context triple: [Scarborough Subway Extension of Line 2 Bloor–Danforth, instanceOf, rapid transit project]
  • A. rapid transit expansion project chosen
    A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
  • B. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • C. commuter rail project
    A commuter rail project is a coordinated planning, design, and construction effort to develop or improve rail services that transport passengers between suburbs or outlying regions and a central urban area, typically focused on reducing congestion and improving regional mobility.
  • D. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • E. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34971b75881908be360bb041f003c completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:37 a.m.