Triple

T33447338
Position Surface form Disambiguated ID Type / Status
Subject Scarborough Subway Extension of Line 2 Bloor–Danforth E856542 entity
Predicate instanceOf P0 FINISHED
Object subway line extension project C24427 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: subway line extension project
Context triple: [Scarborough Subway Extension of Line 2 Bloor–Danforth, instanceOf, subway line extension project]
  • A. subway line extension chosen
    A subway line extension is an added segment of track and stations that lengthens an existing subway route to serve new areas and increase transit capacity.
  • B. commuter rail line extension
    A commuter rail line extension is an added segment of track and associated stations that lengthens an existing suburban passenger rail route to serve new areas and increase connectivity.
  • C. rapid transit expansion project
    A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
  • D. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • E. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34971b75881908be360bb041f003c completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:37 a.m.