Triple
T33441599
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wooden Bridge, Clontarf |
E856377
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | timber bridge |
C18026
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: timber bridge Context triple: [Wooden Bridge, Clontarf, instanceOf, timber bridge]
-
A.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
B.
wooden footbridge
A wooden footbridge is a small, elevated pedestrian crossing made primarily of timber, designed to span obstacles such as streams, ditches, or uneven terrain.
-
C.
timber structure
chosen
A timber structure is a construction system in which the primary load-bearing framework is made from engineered or solid wood members connected to safely transfer loads to the foundation.
-
D.
bridge structure
A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
-
E.
ornamental bridge
An ornamental bridge is a decorative structure, often smaller in scale than functional bridges, designed primarily to enhance the aesthetic appeal of a landscape or garden while sometimes providing light pedestrian passage.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34971b75881908be360bb041f003c |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:37 a.m.