Triple

T33437753
Position Surface form Disambiguated ID Type / Status
Subject OASIS DITA Technical Committee E856273 entity
Predicate outputStatus P48024 FINISHED
Object OASIS Standard NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: OASIS Standard | Statement: [OASIS DITA Technical Committee, outputStatus, OASIS Standard]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: outputStatus
Context triple: [OASIS DITA Technical Committee, outputStatus, OASIS Standard]
  • A. hasOutputStatus chosen
    Indicates that an entity is associated with a particular state or condition of its produced output.
  • B. returnStatus
    Indicates the current outcome or condition of a previously initiated return action or process.
  • C. programStatus
    Indicates the current state or condition of a program within its lifecycle (e.g., planned, active, paused, completed, or terminated).
  • D. outputIs
    Indicates that one entity functions as the result, product, or outcome produced by another entity or process.
  • E. functionStatus
    Indicates the operational state or condition of a function (e.g., active, inactive, pending, or failed) at a given time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349709e7881908c342b4d34f555f4 completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69f6f8164698819090c1b471f1caa4c6 completed May 3, 2026, 7:24 a.m.
PD Predicate disambiguation batch_69f6f6619404819084662aef1238261c completed May 3, 2026, 7:16 a.m.
Created at: May 1, 2026, 1:36 a.m.