Triple
T33428300
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Centre Street commercial district |
E856050
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | main street corridor |
C41709
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: main street corridor Context triple: [Centre Street commercial district, instanceOf, main street corridor]
-
A.
main thoroughfare
A main thoroughfare is a primary road or street in a city or town that carries the highest volume of traffic and connects major destinations.
-
B.
neighborhood corridor
chosen
A neighborhood corridor is a linear, mixed-use area within a community that concentrates housing, shops, services, and transportation along a primary street to support walkability and local activity.
-
C.
civic thoroughfare
A civic thoroughfare is a major public street or corridor designed to accommodate high volumes of movement while structuring and showcasing key civic, cultural, and institutional functions of a community.
-
D.
avenue
An avenue is a broad, often tree-lined street or thoroughfare designed to accommodate significant vehicular and pedestrian traffic within an urban or suburban area.
-
E.
east–west thoroughfare
An east–west thoroughfare is a primary transportation route or street that runs predominantly in an east–west direction, facilitating significant cross-town or regional movement.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349709e7881908c342b4d34f555f4 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:36 a.m.