Triple

T33415540
Position Surface form Disambiguated ID Type / Status
Subject Scream Extractor E855704 entity
Predicate instanceOf P0 FINISHED
Object energy-harvesting machine C17495 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: energy-harvesting machine
Context triple: [Scream Extractor, instanceOf, energy-harvesting machine]
  • A. energy management device
    An energy management device is a system component that monitors, controls, and optimizes the consumption, storage, and distribution of energy within a defined environment or network.
  • B. energy cultivation system
    An energy cultivation system is a structured framework of methods, stages, and resources through which practitioners absorb, refine, and manipulate internal or external energies to enhance their abilities or achieve higher states of power or consciousness.
  • C. heat engine
    A heat engine is a system that converts thermal energy into mechanical work by exploiting a temperature difference between a hot reservoir and a cold reservoir.
  • D. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • E. energy hub chosen
    An energy hub is a centralized system or facility that integrates, converts, stores, and distributes multiple forms of energy (such as electricity, heat, and fuels) to optimize efficiency, reliability, and sustainability across connected users and infrastructures.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3496f04a08190804e56ac5098b8e4 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:36 a.m.