Triple
T33398909
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ville Nouvelle of Rabat |
E855242
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned city extension |
C22
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned city extension Context triple: [Ville Nouvelle of Rabat, instanceOf, planned city extension]
-
A.
planned city
chosen
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
B.
planned garden city
A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
-
C.
subway line extension
A subway line extension is an added segment of track and stations that lengthens an existing subway route to serve new areas and increase transit capacity.
-
D.
planned development
A planned development is a real estate project in which land use, building placement, density, and amenities are comprehensively designed and approved as a unified, coordinated plan rather than as individual, piecemeal developments.
-
E.
town plan
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3496e3f1c8190bcecfa82aa9d17ff |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:35 a.m.