Triple

T33398909
Position Surface form Disambiguated ID Type / Status
Subject Ville Nouvelle of Rabat E855242 entity
Predicate instanceOf P0 FINISHED
Object planned city extension C22 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned city extension
Context triple: [Ville Nouvelle of Rabat, instanceOf, planned city extension]
  • A. planned city chosen
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. planned garden city
    A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
  • C. subway line extension
    A subway line extension is an added segment of track and stations that lengthens an existing subway route to serve new areas and increase transit capacity.
  • D. planned development
    A planned development is a real estate project in which land use, building placement, density, and amenities are comprehensively designed and approved as a unified, coordinated plan rather than as individual, piecemeal developments.
  • E. town plan
    A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3496e3f1c8190bcecfa82aa9d17ff completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:35 a.m.