Triple

T33332595
Position Surface form Disambiguated ID Type / Status
Subject Soviet economy E853446 entity
Predicate mainPlanningInstrument P95136 FINISHED
Object Five-Year Plan NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Five-Year Plan | Statement: [Soviet economy, mainPlanningInstrument, Five-Year Plan]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: mainPlanningInstrument
Context triple: [Soviet economy, mainPlanningInstrument, Five-Year Plan]
  • A. hasPlanningInstrument chosen
    Indicates that an entity is associated with, or governed by, a specific planning instrument (such as a plan, policy, or regulatory document) that guides its development or management.
  • B. regionalPlanningInstrument
    Indicates that an entity is a formal tool, policy, or framework used to guide and regulate planning and development within a specific geographic region.
  • C. managementPlanningTool
    Indicates that an entity is a tool or system used to support, organize, or execute management planning activities for another entity or process.
  • D. masterplannedBy
    Indicates that an area or development project has been comprehensively designed or organized according to an overarching plan created by a specific planner or planning entity.
  • E. planningDiscipline
    Indicates that an entity applies structured planning methods, rules, or practices to organize and manage activities or processes.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34969614c81909cd99661b0902533 completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69f75dc25fa08190b371faf36d9fb72c completed May 3, 2026, 2:37 p.m.
PD Predicate disambiguation batch_69f758586534819083e91172f4bf5098 completed May 3, 2026, 2:14 p.m.
Created at: May 1, 2026, 1:34 a.m.