Triple

T33331803
Position Surface form Disambiguated ID Type / Status
Subject Coro, Venezuela E853424 entity
Predicate heritageThreats P49657 FINISHED
Object heavy rains and inadequate drainage LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: heavy rains and inadequate drainage | Statement: [Coro, Venezuela, heritageThreats, heavy rains and inadequate drainage]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: heritageThreats
Context triple: [Coro, Venezuela, heritageThreats, heavy rains and inadequate drainage]
  • A. heritageThreat chosen
    Indicates that an entity poses a risk of damage, loss, or degradation to cultural, historical, or natural heritage.
  • B. heritageProtectionIssues
    Indicates that there are concerns, conflicts, or regulatory constraints related to the protection or preservation of cultural, historical, or natural heritage associated with the entities.
  • C. heritageImpact
    Indicates the effect that an action, project, or condition has on the preservation, integrity, or value of cultural or historical heritage.
  • D. heritageRescueCampaign
    Indicates a coordinated effort or initiative aimed at protecting, preserving, or restoring cultural or historical heritage at risk.
  • E. heritageManagement
    Indicates the management, preservation, and regulation of cultural or natural heritage resources by responsible entities.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34969614c81909cd99661b0902533 completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69fcc4b700748190ae00b21d09c96695 completed May 7, 2026, 4:58 p.m.
PD Predicate disambiguation batch_69fcb0f9d3d881908a049475182fb039 completed May 7, 2026, 3:34 p.m.
Created at: May 1, 2026, 1:34 a.m.